Egypt International Exhibition Center (EIEC): a guide for exhibitors
The Egypt International Exhibition Center (EIEC) was completed in 2017 as Egypt's largest international exhibition centre, in the Fifth Settlement, New Cairo. It has four exhibition halls of about 10,000 m² each with an 8 m ceiling, outdoor display areas and a connected conference centre. Stand rules such as height limits and build-up times are set by each show's organiser, so read the manual early.
Key points
- EIEC sits in the Fifth Settlement, New Cairo, just off the El Mosheer axis and about 1.2 km west of the Ring Road entrance to New Cairo.
- The site covers about 311,000 m²; the four exhibition halls give about 40,000 m² of indoor space, with 65,000 m² of outdoor display area and parking for about 2,200 cars.
- Halls have an 8 m ceiling, but organisers usually cap stand height lower: recent shows set 4 m and 5 m limits.
- Drilling into hall floors, walls and columns has been prohibited at recent shows; carpets are taped, not glued.
- Build-up windows vary from one afternoon to several days, so confirm them before you plan production.
- Plan around the organiser's manual: design approval, electrical orders, fire-retardant certificates and contractor passes all have deadlines.
Where is the Egypt International Exhibition Center?
EIEC («مركز مصر للمعارض الدولية») is in the Fifth Settlement (التجمع الخامس), New Cairo. It lies about 300 m south of the El Mosheer axis and about 1.2 km west of the Ring Road entrance to New Cairo, so most visitors and contractors arrive by car or coach via the Ring Road. It was built by the Egyptian Armed Forces and completed at the end of 2017.
Do not confuse it with the Cairo International Convention Centre in Nasr City, which is a different venue. When a show says "EIEC", it means the New Cairo exhibition centre.
EIEC at a glance: halls, space and facilities
| Item | Detail |
|---|---|
| Location | Fifth Settlement, New Cairo, off the El Mosheer axis |
| Total site | About 311,000 m² (about 74 feddans); buildings cover about 23% |
| Exhibition halls | Four halls of about 10,000 m² each, about 40,000 m² in total; they can be divided or combined |
| Ceiling height in the halls | 8 m |
| Outdoor display areas | About 65,000 m² |
| Parking | About 2,200 cars; open areas can also serve as parking |
| Conference facilities | A gate gives direct access to the conference centre |
| Visitor facilities | Registration booths, multi-purpose offices, coffee shops and a food court |
Halls are referred to by number (Hall 1 to Hall 4) in show floor plans. Services such as water and drainage are not available everywhere: at a recent show, water and drainage connections were offered only in the first area of Hall 4. If your stand needs a sink, coffee machine or demo with water, confirm the location before you choose your space.
Who sets the stand rules at EIEC?
The venue provides the halls and its safety requirements; each show's organiser publishes an exhibitor manual with the rules for that show. The same hall can have different height limits, build-up times and contractor rules from one show to the next. Always work from the current manual for your show, and send your stand builder a copy as soon as you book.
The table compares rules from two recent international shows at EIEC. It shows how much they can differ, and which points to look for in your own manual.
| Rule | 2024 expo, Halls 3 and 4 | 2023 trade show, Hall 1 |
|---|---|---|
| Maximum stand height | 5 m in all halls | 4 m for custom stands |
| Build-up | About two days for space-only builders, about three weeks before opening | One afternoon (12:00–18:00) the day before opening |
| Dismantling | From the last evening, over about two days | From 16:00 on the last day; all removed by 23:00 |
| Design approval | 3D designs of custom stands submitted about six weeks before opening | Custom stands through the official contractor unless written permission is given |
| Floor fixing | No drilling into floors, walls or columns; carpet taped, not glued | Floor load up to 5 tonnes per 9 m² stand; machines over 3 tonnes on spread plates |
| Hanging | No banners or flags hung from ceilings, entrances or corridors | Ceiling signs only with prior written approval |
| Other | Fabrics and carpets sprayed fire-retardant with a certificate; raised floors no higher than 10 cm and wheelchair accessible | Exhibitor forklifts not permitted; passport copies submitted for permits |
Space only or shell scheme: which stand type at EIEC?
| Point | Shell scheme | Space only (custom stand) |
|---|---|---|
| What you get | Walls, fascia name board, carpet, basic lighting and furniture from the organiser's contractor | Bare floor; you design and build the stand with your own contractor |
| Minimum size | Often smaller; one recent EIEC show sold shell stands from 12 m² | Often larger; the same show set an 18 m² minimum for space only |
| Brand impact | Limited to graphics on standard panels | Full control of layout, height (within the limit), lighting and materials |
| Approvals | Handled by the organiser | Design drawings, electrical plan, contractor registration and safety documents |
| Best for | First-time or short-notice exhibitors | Product launches, demos, meeting areas and strong brand presence |
For budgets, read the exhibition stand cost guide, which covers space rates, build methods and the extra charges organisers add.
What build-up rules should you expect at EIEC?
- Height. The halls are 8 m high, but expect the organiser to cap stands lower; recent limits were 4 m and 5 m. Ask before you design a tall structure or a double-deck.
- No drilling. Stands must be freestanding. Plan ballast, bracing and connections that do not fix into the hall floor, walls or columns.
- Carpet and flooring. Tape only, removed at the end; raised floors at one show were limited to 10 cm and needed a wheelchair ramp.
- Fire safety. Fabrics and carpets treated with fire retardant, with a certificate; no heaters or compressed gas cylinders; escape routes and fire hose cabinets kept clear; no smoking in the halls.
- Electrics. Continuous cables with no taped joints, a distribution board with fuses and breakers on every stand, and an electrical plan submitted with the order. Late orders attract heavy surcharges.
- Access and loading. Contractors use the designated loading doors, not visitor entrances, and wear safety shoes, high-visibility vests in loading bays and hard hats near double-deck stands or scaffolding.
- Open sides. At a recent show, walls facing neighbouring stands had to be finished in plain white, with about 30% of the frontage left open to the aisle.
How far ahead should you plan an EIEC stand?
- Book space early and get the floor plan, hall number, stand number, open sides and the exhibitor manual.
- Brief your stand builder with objectives, products, meeting needs, budget and the manual.
- Design and approve internally, allowing for the organiser's design deadline, which at one recent show was about six weeks before opening.
- Submit drawings and orders: 3D design, structural details, electrical plan and power order, internet, rigging (if allowed) and furniture.
- Produce off site in a workshop, with graphics printed and checked before load-out.
- Register the contractor and workers for passes and permits; some shows ask for passport copies or ID in advance.
- Build up within the window, then pass the organiser's inspection before the doors open.
- Dismantle and clear by the deadline; damage to the hall and late removal are charged.
How do visitors and staff get to EIEC?
- By car: via the Ring Road and the El Mosheer axis; the venue has large surface parking.
- Staff and stand teams: plan shuttles or car pools for build-up and show days, especially for early starts and late finishes.
- Show hours: at a recent show, halls opened to exhibitors an hour before visitors; check the badge rules for build-up, show days and dismantling.
- Food and meetings: the venue has coffee shops and a food court, and the conference centre is connected for seminars and side events.
EIEC exhibitor checklist
- Exhibitor manual for your show, with all deadlines in one calendar.
- Hall number, stand number, size, open sides and any nearby columns or services.
- Maximum stand height and rules for double-deck, rigging and hanging signs.
- Design approval submitted before the deadline.
- Electrical plan and power order, plus water and drainage if needed (confirm availability in your hall).
- Fire-retardant certificates for fabrics, carpets and timber finishes.
- Contractor registration, worker passes and safety equipment (PPE).
- Insurance: exhibits and public liability, as the organiser requires.
- Logistics: loading door, delivery slot, storage and freight for any exhibits.
- Dismantling plan and removal deadline.
FUSE designs and builds custom exhibition stands in Egypt and works from each show's manual, handling design approval, production in the workshop, build-up and dismantling. See exhibition stands in Egypt and FUSE, or read the exhibition stand cost guide to plan your budget.
EIEC exhibitor FAQ
Where is the Egypt International Exhibition Center?
EIEC is in the Fifth Settlement, New Cairo, about 300 m south of the El Mosheer axis and about 1.2 km west of the Ring Road entrance to New Cairo. It is a different venue from the Cairo International Convention Centre in Nasr City.
How many halls does EIEC have?
EIEC has four exhibition halls of about 10,000 m² each, giving about 40,000 m² of indoor space that can be divided or combined. It also has about 65,000 m² of outdoor display areas and a connected conference centre.
What is the ceiling height in the EIEC halls?
The halls have an 8 m ceiling height. Stand heights are capped lower by each show organiser; recent shows set limits of 4 m and 5 m. Check the manual for your show before designing.
What is the maximum stand height at EIEC?
It is set by the organiser of each show, not by a single venue rule. A 2024 expo allowed 5 m in all halls and a 2023 trade show allowed 4 m for custom stands. Confirm the limit and any double-deck rules in your exhibitor manual.
Can I drill into the floor at EIEC?
At recent shows, drilling into hall floors, walls and columns was prohibited and carpet could only be fixed with tape, removed after the show. Stands must be freestanding, with ballast and bracing designed for that.
How long is build-up at EIEC?
It depends on the show. Recent examples range from a single afternoon before opening to about two days for space-only builders. Plan production so the stand arrives ready to assemble, and confirm the window in the manual.
Is there parking at EIEC?
Yes. The venue has parking for about 2,200 cars, and open areas can also be used for parking during large events.
Do I need an approved contractor to build at EIEC?
It depends on the show. Some organisers let space-only exhibitors use their own builder after registration; others require the official contractor unless written permission is given. Check the manual and register your contractor early.
How much does a stand at EIEC cost?
Cost depends on the space rate, stand size and type, design, materials, AV and organiser charges such as power and contractor fees. FUSE prices each stand after the brief and the show manual; the exhibition stand cost guide explains the budget lines.
What do you need to quote a stand at EIEC?
Send the show name and dates, hall and stand number, size and open sides, the exhibitor manual, your objectives and products, and any brand guidelines. FUSE returns a design and an itemised quotation based on the show rules.