ع
Guide · FUSE

Exhibition stand cost in Egypt: how to budget your booth

An exhibition stand in Egypt costs far more than its floor space. As a rule of thumb, space is roughly 30–38% of total exhibiting cost, so plan for about three times the space rent. Space rates at Cairo venues were about US$220–275 per m² (2024); build cost depends on stand type, size, materials and lead time.

Last updated:
Reviewed by Eng. Ahmed Shalaby, Founder & Chairman, Shalaby Enterprises

Key points

  • Floor space is typically about 37.9% of the average exhibit budget; services, design, travel and shipping make up the rest.
  • A common rule of thumb: total show cost is about 3× the space cost.
  • EGYPES, Big 5 Construct Egypt and Cityscape Egypt price space on request; ask the organiser for the current rate card.
  • Stand build cost per m² depends on the specification and is priced per project. Compare itemised quotes on the same brief.
  • Egyptian exhibitor manuals typically cap stand height at 5–6 m, require fire-retardant certificates, and fine late power orders.
  • Plan custom stands 3–6 months ahead; in 2027, Ramadan (from about 8 February) runs into EGYPES preparation.

How much does an exhibition stand cost in Egypt?

There is no single price: the total is space rent, plus the stand build, plus organiser services, logistics, staff and promotion. Space is usually the smaller part of the budget.

What makes up an exhibition stand budget?

Three groups: space, the stand itself, and everything that supports it (services, logistics, people and promotion). Internationally, exhibitors typically split their spending like this:

Typical share of total exhibit budget by category (2017 figures). International averages, not Egypt-specific.
Budget lineShare
Exhibit space37.9%
Show services12.8%
Exhibit design (incl. graphics)11.4%
Travel and entertainment10.9%
Shipping8.9%
On-site promotion5.2%
Off-floor promotion3.9%
On-site sponsorship2.9%
Lead management2.7%
Pre-show promotion1.7%
Staff training0.7%
Other1.0%

As a rule of thumb, total show costs average about three times the space cost, with space at about 30% of the total. With space at 30–38%, the total is roughly 2.6–3.3 times the space rent. Another common split puts space and stand design together at about 60%, staffing, travel and logistics at about 25%, and marketing at about 15%.

These are international averages (2017 figures): use them as a structure, not a price. A local exhibitor spends less on travel; a foreign one shipping a stand in spends more on freight.

How much does exhibition space cost per m² in Egypt?

Space at Cairo venues cost about US$220–275 per m² (2024); the main 2027 trade shows price space on request.

Space rates for events in Egypt. Indicative only; not a quote. Always get the current rate card from the organiser.
Event / venueRateYearNotes
WUF12 (UN-Habitat), EIEC, Halls 3–4US$220/m²2024Indoor stand space
Cairo International Fair (EECA), Cairo International Convention CentreUS$275/m²2024Covered, furnished area; plus 14% VAT. Self-build construction fee US$10/m²; storage US$100/m²
Cairo International Book FairEGP 2,700/m²2026Cut from EGP 3,800/m²; a consumer fair, not a B2B trade show
Big 5 Construct Egypt, EIECFrom US$4,500 per booking2025Minimum booking; per-m² prices not shown
EGYPES, EIECOn request2027Enquiries go to the organiser

Overseas resellers sometimes quote much higher figures, for example US$650/m² raw space for Cairo ICT 2026; those prices include the agent's margin. These are indicative market figures, not a quote: FUSE prices each stand per project after receiving the show details and brief.

How much does it cost to build a stand per m² in Egypt?

Build cost per m² depends on the stand type, materials, height, AV and lead time, so FUSE prices each stand per project rather than quoting a flat rate. US or UK figures do not transfer to Egyptian labour and materials.

What you can control are the drivers of build cost:

  • Stand type and open sides. An island or peninsula stand has more finished faces and more structure than an inline stand of the same area.
  • Materials and finish. Timber, laminate, metal, glass and fabric differ in cost and reusability.
  • Height and structure. Tall walls, bulkheads, hanging signs and double-deck floors add engineering, approvals and labour.
  • Graphics, AV and lighting. Large-format print, LED screens and lighting can be rented or bought; rental usually suits a single show.
  • Storage and meeting rooms. Closed rooms add walls, doors and ceilings.
  • Lead time. A late brief limits design choices and forces overtime or premium materials.
  • Reuse. A stand designed to be stored and rebuilt costs more the first time and less per show after that.

What is the difference between shell scheme, modular and custom stands?

Shell scheme is the organiser's standard booth, modular uses a reusable system, and custom is designed and built for your brand. They differ in cost, impact and flexibility.

TypeWhat you getRelative costBest forWatch out for
Shell schemeOrganiser's walls, fascia, basic lighting and carpet; you add graphics and furnitureLowestFirst shows, small budgetsLimited branding; looks like neighbouring stands
Modular / systemReusable aluminium frames with fabric or panels; can be rented ("ready-made" stands)Low to medium; lower per show if reusedCompanies exhibiting several times a yearSome Egyptian events have banned aluminium system stands (WUF12, 2024); check the manual
Custom-builtDesigned for your brand, built in timber, metal, glass and printHighestKey shows, launches, meeting-heavy standsNeeds the longest lead time and drawing approval
Double-deckA custom stand with an upper floor for meetingsHighest per m² of floorLarge stands where floor space is scarceHeight limits, structural approval, rigging charges

What are the standard booth sizes? How big is a 3×3 booth?

A 3×3 booth measures 3 m by 3 m: 9 m² of floor. It is the smallest typical shell-scheme package; the next sizes up are usually 6×3 m (18 m²) and 9×3 m (27 m²). Each show sets its own sizes, so check the organiser's floor plan.

Common booth sizes with a typical shell-scheme package (2024). Contents vary by show.
SizeFloor areaTypical shell package (2024)Planning notes
3 × 3 m9 m²2 chairs, 1 table, 2 spotlights, 1 power point, carpetA counter, graphics and one screen; little storage
6 × 3 m18 m²4 chairs, 2 tables, 4 spotlights, 2 power pointsRoom for a small meeting corner or a lockable store
9 × 3 m27 m²6 chairs, 3 tables, 6 spotlights, 3 power pointsLong frontage that can be split into display and meeting zones
6 × 6 m36 m²Not in that package; booked as space onlyFits a closed meeting room and storage; may have three or four open sides

Shell-scheme walls are typically 2.5 m high, and space-only stands must build partition walls at least that high. Open sides matter as much as area: a corner, peninsula or island stand has more finished faces than an inline stand of the same size, so it costs more to build.

How do you design an exhibition booth? Brief, stages and approvals

Booth design starts with a written brief, moves through a concept and 3D renders to technical drawings, and ends with the organiser's approval before production. Each stage needs sign-off before the next, so late changes cost time and money.

What should a booth design brief include?

  • The show and the plot: show name, hall, stand number, size, open sides and the organiser's floor plan.
  • Objectives: launches, meetings, demos or lead capture, and how you will measure them.
  • What must fit: products to display (with sizes and weights), screens, counters, meeting seats and storage.
  • Brand: guidelines, logo files and the one message visitors should read from the aisle. If you have no current guidelines, FUSE also offers brand management, including brand guidelines.
  • Rules: the exhibitor manual, height limit, rigging and fire requirements.
  • Budget range and decision date, and whether the stand will be stored and reused.

Booth design stages

  1. Concept: zones and visitor flow, sketched on the plot and its open sides.
  2. 3D renders: views from each open side showing materials, lighting and graphics. Agree in writing how many revision rounds are included.
  3. Technical drawings: plan, elevations, electrical layout and materials. Organisers typically ask for plans at a scale of at least 1:50 showing open sides, the heights of all fittings, materials and fire protection.
  4. Organiser approval: drawings go in with a risk assessment and method statement; complex stands also need structural calculations and an engineer's confirmation. WUF12 at EIEC wanted custom stand 3D designs about six weeks before opening.
  5. Artwork and production: final graphic files, material samples and a build plan that fits the build-up window.

A simple booth on a limited budget

Use the shell scheme or a rented modular system, spend on one strong graphic wall and good lighting, keep furniture to a counter and a few stools, and leave the front open so visitors can step in.

What does the organiser charge separately from the stand builder?

Space and most venue services are bought from the organiser or its official contractors, not from your stand builder. A clear quote lists them as exclusions.

Usually from the organiser or venueUsually from the stand builder
Floor space rentStand design and 3D visuals
Electrical connection and consumptionConstruction, finishes and flooring
Rigging points and airspace chargesGraphics and signage
Water, internet, cleaning, securityStand lighting, AV and furniture
Exhibitor and contractor badgesTransport, build-up and dismantling labour
Official freight and on-site handlingStorage between shows

Which exhibitor rules in Egypt affect stand cost?

The 2026–27 manuals for EGYPES, Cityscape Egypt and Big 5 Construct Egypt are issued to booked exhibitors. Recent manuals for Cairo venues (2024) show the kind of rules that change a budget:

  • Height limits. WUF12 at EIEC allowed a maximum of 5 m in all halls; the Cairo International Fair allowed 6 m in covered areas. Major international organisers typically set 4 m for single-storey and 6 m for two-storey stands (2025), so expect similar rules at large shows.
  • Fire-retardant certificates. WUF12 required fabrics and carpets to be fire-treated, with a certificate from an approved contractor. The Cairo International Fair required tents and carpets treated with approved materials and the certificate given to Civil Protection, plus fire extinguishers.
  • No drilling or glue. At WUF12 (EIEC), drilling into floors, walls or columns was prohibited and carpet could only be fixed with tape.
  • Power orders and late fines. Electricity was compulsory for space-only stands at WUF12: US$500 for a 3-phase connection, with a late-request fine of US$3,185 plus a 40% surcharge close to build-up (2024).
  • Drawing deadlines. WUF12 asked for custom stand 3D designs about six weeks before opening; the Cairo International Fair required drawings approved at least 7 days before site handover and removal within 3 days after the show (2024).
  • Rigging. At major shows, hanging structures typically go only through the official contractor, up to 6 m, with an airspace charge.
  • Insurance. At WUF12 the official forwarder did not include cargo insurance; exhibitors had to insure goods in transit.

Rules change by show and year; share your own manual with your builder as soon as you book.

When are the main exhibitions in Egypt in 2027?

The early part of the year is shaped by Ramadan, then EGYPES in late March, Big 5 Construct Egypt in June and Cityscape Egypt in September.

Dates as of 24 November 2026. Confirm before booking.
Event2027 datesVenueNote
RamadanExpected from about 8 Feb; Eid al-Fitr about 9–11 Mar—Astronomical projection, subject to moon sighting
EGYPES (Egypt Energy Show)30 Mar – 1 Apr (some announcements give 29–31 Mar)EIEC, CairoConfirm the exact dates with the organiser
Big 5 Construct Egypt14–16 JunEIEC, Cairo300+ exhibitors expected
Cityscape EgyptSeptember (days not announced)Not announcedThe 2026 edition ran 30 Sep – 3 Oct at EIEC
Cairo ICTNovember (unconfirmed)—The 2026 edition ran 7–10 Nov at EIEC

Ramadan ends only about three weeks before EGYPES opens. Design approval, production and graphics for an EGYPES stand will fall during Ramadan, when working hours are shorter, so lock decisions before February. The Egypt International Exhibition Centre has four halls with over 40,300 m² of space and an 8 m ceiling.

How far in advance should you plan an exhibition stand?

For a custom stand, start 3–6 months before the show. Ideally, order 6+ months out and finalise the design about 5 months ahead; organiser drawing deadlines in Egypt have fallen about six weeks before opening.

  1. 6+ months: book space and read the rate card; set the objective and budget.
  2. About 5 months: brief builders, compare designs and itemised quotes, finalise the design.
  3. 3–4 months: finalise artwork and AV content.
  4. By the manual's deadline: submit drawings, fire certificates and power orders to avoid late fees.
  5. 1 month: confirm build-up slots, badges, freight and staff.

In our practice at FUSE, two to three months is the minimum for a stand that is not rushed; large custom stands need more.

Exhibition stand budget checklist

  • Show name, hall, stand number, area and number of open sides.
  • Organiser rate card, exhibitor manual and all deadlines.
  • Objectives: launches, meetings, demos, lead capture.
  • Must-have features: storage, meeting room, screens, product display.
  • Height limit, rigging rules and approval requirements.
  • Fire-retardant certificates for fabrics, carpets and timber.
  • Power, water, internet and badge orders, placed early to avoid late fees.
  • Freight, insurance, build-up and dismantling windows.
  • Staff, travel, promotion and lead-capture costs.
  • Brand guidelines and a reuse or storage plan.
  • A total budget range, using about 3× the space rent as a first estimate.

FUSE, the events and exhibitions company of Shalaby Enterprises, designs and builds exhibition stands in Egypt and prices them item by item, with the organiser's charges listed separately. See also our guides to corporate event planning in Egypt and choosing a fit-out contractor, or all guides.

Frequently asked questions

How much does an exhibition stand cost per m² in Egypt?

Stand build cost per m² depends on stand type, materials, height, AV and lead time, and is priced per project. Space rent at Cairo venues was about US$220–275 per m² in 2024, and as a rule of thumb the total budget is about three times the space cost.

How much does a 3D booth design cost?

Most stand builders include 3D design in their proposal when they also build the stand. If you want design only, ask in writing whether it is charged separately, how many revisions are included, and who owns the files. Compare design fees only between proposals that answer the same brief.

How big is a 3x3 booth?

A 3x3 booth is 3 metres wide and 3 metres deep, giving 9 m² of floor. A typical shell-scheme package comes with walls, a fascia name board, carpet, two chairs, a table, two spotlights and a power point, and shell walls are typically 2.5 m high. Check your own show's package, as contents vary.

How do you design a booth for an exhibition?

Start with a brief: the show, stand size and open sides, objectives, products, brand files, the exhibitor manual and a budget range. The designer then produces a concept, 3D renders and technical drawings. The organiser approves the drawings, usually with a risk assessment and method statement, before graphics and production start.

What is the difference between shell scheme, modular and custom stands?

A shell scheme is the organiser's standard booth with walls, fascia and basic lighting. A modular stand uses a reusable frame system that can be rented or bought. A custom stand is designed and built for your brand. Cost, visual impact and lead time rise in that order.

Can I rent a ready-made stand instead of building one?

Yes. Rented or ready-made stands are usually modular systems, which lower the cost of a first show. If you exhibit several times a year, buying a reusable system and storing it may cost less over time. Check the manual first, since some Egyptian events have banned aluminium system stands.

What is not included in the stand builder's price?

Space rent and most organiser services are usually ordered separately: electrical connection, rigging points, water, internet, cleaning and badges. Freight, insurance and storage may or may not be included. A good quote lists every exclusion, so you can compare builders on the same basis.

How far in advance should I book a stand builder?

For a custom stand, start three to six months before the show. Ideally, finalise the design about five months ahead, and Egyptian organiser drawing deadlines have fallen about six weeks before opening. In our experience, two to three months is the minimum for a stand that is not rushed.

Are double-decker stands worth it?

A second floor makes sense when you need meeting space and floor area is scarce or expensive. It adds structural engineering, approvals and build time, and venues cap height: 5 m at WUF12 at EIEC and 6 m at the Cairo International Fair in 2024. Check your show's manual before designing one.

How much does space cost at EGYPES, Cityscape Egypt or Big 5 Construct Egypt?

These organisers price space on request; ask for a rate card. Big 5 Construct Egypt bookings started from US$4,500 in 2025. For comparison, 2024 rates at Cairo venues were US$220 per m² (WUF12) and US$275 per m² (Cairo International Fair).

Do Ramadan and Eid affect exhibition planning in Egypt?

Yes. In 2027 Ramadan is expected to start around 8 February, with Eid al-Fitr around 9–11 March, about three weeks before EGYPES. Working hours are shorter during Ramadan, so finalise design, artwork, approvals and power orders before it starts, and leave a buffer for the Eid holiday.

WhatsApp